
Welcome to the RV-7A Builder's Log
Follow the exciting journey of building a Van's RV-7A kit airplane. This is a personal log documenting every step, from the first rivet to the final flight. Join me as I transform a kit into a dream.
Our build progress at a glance
Explore the main stages of this ambitious airplane build. Each section details the hours spent, challenges overcome, and milestones achieved.
Empennage
The empennage, or tail section, is the foundation of stability. Follow the initial steps of construction and watch as the horizontal and vertical stabilizers take shape.
Wings
The wings are critical for flight. This section documents the intricate process of assembling spars, ribs, and skins, leading to the full wing structure.
Fuselage
The fuselage is the heart of the aircraft. Discover the detailed work involved in building the main body, from bulkheads to cabin structure.
Avionics
Integrating the advanced avionics system is a precise task. See how the instrumentation, wiring, and navigation systems are brought to life.
"Every rivet tells a story, every hour builds a dream. This log is a testament to the dedication required to build an aircraft."
[[name]], RV-7A Builder

Current build time
As of today, the total build time for the RV-7A stands at: 23.5 hours.
Location
North Fort Myers Florida, United States
Contact